About this work:
Completion and optimization works of the Turin–Milan Highway with local road connectivity through the interconnection between SS32 'Ticinese' and SP299.
- Geotechnical monitoring of road embankments to check upon ground settlements, deformation and interstitial pressure variations, by means of extenso-inclinometric and piezometer columns, multi-point settlement gauges and topographic benchmarks
- Monitoring of interfering railway tracks by means of biaxial elector-levels and topographic reference points
- Multi-annual monitoring data management service, puiblishing of data and reports on dedicated web pages