A2 SA-RC Highway - Monitoring DG/48 Macrolotto 2

About this work:

DG/48 Macrolotto 2 - Completion and optimization works to type 1/a of the CNR80 standards, section between km 108+000 and km 139+000 of the del A2 Salerno-Reggio Calabria Highway (multiple sites)

Geotechnical and structural monitoring stations of the designed structures upon construction and operation phases

  • Client:
    SIS S.c.p.a.
  • Period:
    2009 - 2016

Similar works: