About this work:
DG/48 Macrolotto 2 - Completion and optimization works to type 1/a of the CNR80 standards, section between km 108+000 and km 139+000 of the del A2 Salerno-Reggio Calabria Highway (multiple sites)
Geotechnical and structural monitoring stations of the designed structures upon construction and operation phases
-
Client:SIS S.c.p.a.
-
Period:2009 - 2016

Stazione di monitoraggio geotecnico - A2 SA-RC Macrolotto 2