
About this work:
A2 SA-RC Highway, DG 48/04: modernization and adaptation works to the type 1/a of the CNR/80 standards, from km 108+000 to km 139+000, between Lagonegro and Lauria (PZ).
The service comprised:
- Revamping of pre-existing automated monitoring systems, including their maintenance and renewal;
- Inclinometer and piezometer measuring campaigns
- Data management via web-based sw platform
- Characterization of road structures' integrity with in situ direct and non destructive testing .
-
Client:SIS S.c.p.a.
-
Period:2021 - 2022

Prospezione GPR in calotta - Galleria Malo - Pedemontana Veneta (VI)

Stazione di monitoraggio inclinometrico - Galleria Sirino - A2 Macrolotto 3.2

Stendimento sismico - Galleria Malo - Pedemontana Veneta (VI)
