A2 SA-RC Highway - Buonabitacolo-Lauria Section

About this work:

Maintenance and restoration interventions of the automatic inclino-piezometric monitoring network for geotechnical and structural control installed at the Noce and Torbido viaducts (PZ), the Taggine-Sirino area (PZ), and the Gallarizzo Viaduct (CS), affected by the development of landslide phenomena.

Management of real-time monitoring data and publication of data on a Web-Based platform.

  • Client:
  • Period:
    2018-2019

Similar works: