Executive design for the new Sewer Collector in Torino (Italy)

About this work:

Geological investigations to support the executive design

Geognostic boreholes, in-situ tests (permeability, pressiometric, SPT), undisturbed sampling for laboratory analysis, MASW tests, and ground-penetrating radar (GPR) surveys

  • Client:
    COL.ME.TO. Scarl
  • Period:
    2020

Similar works: