
About this work:
Construction of an underground multi-level parking inside the Polytechnic Citadel
Geotechnical and structural monitoring during construction:
- Structural monitoring of retaining structures: Installation of extenso-inclinometric columns for controlling ground subsidence, load cells, strain gaue and topographic targets
- Topographic monitoring of pre-existing buildings within the construction area
- Data management on dedicated webpages.